Commercial arcade integration for global operatorsRequest planning support
Spec-first integration

Bandai Namco Operator Spec Library

Use these records to structure a model-specific submittal; values shown here are planning fields, not universal product claims.

Arcade and redemption submittal index

DIM-A

Cabinet envelope

Width × depth × height, shipping dimensions, mass, center of gravity and service-door swing.

Request PDF
PWR-B

Electrical schedule

Rated voltage, frequency, full-load current, plug, heat rejection and circuit recommendation.

Request PDF
PAY-C

Payment and payout I/O

Coin comparator, bill validator, RFID reader, ticket dispenser and interface pinout.

Request PDF
NET-D

Network and fleet record

Ethernet or Wi-Fi requirement, ports, update method, remote diagnostics and data ownership.

Request PDF

VR and simulation verification sheet

Refresh target90–120 Hz class; confirm model, render workload and fallback behavior.
ResolutionRecord pixels per eye, display mode and required GPU configuration.
Tracking volumeMeasure usable m², sensor positions, occlusion zones and boundary margin.
Session resetTime cleaning, headset fit, content reload and operator recovery separately.

Test method

Use the production headset and compute image in the final lighting condition. Run 30 sessions, log dropped frames, tracking loss and recovery time, repeat at peak network load, and retain the software version with the result.

Known limits

Display comfort varies by user and content. Wireless tracking can be affected by reflective surfaces and lighting. Motion systems require additional floor, e-stop and maintenance review. Published planning examples do not replace a model-specific drawing.